Design-Build

Design-build puts design and construction under one contract: the owner engages EWB, and EWB teams with architects and engineers to deliver the project from concept through keys with single-point accountability for cost, schedule, and performance.

When this method is the right call

  • The owner wants one accountable party instead of refereeing between architect and builder
  • Speed matters: design and construction can overlap under one roof
  • The program is well understood — a prototype, a rollout, a building type we have delivered repeatedly
  • Budget certainty early in design is worth more than maximum design iteration

Advantages

  • Single-point accountability — no gap between design errors and construction claims
  • Fastest overall schedule of the standard delivery methods
  • Cost certainty earlier than design-bid-build can offer
  • Fewer change orders, because the builder priced its own documents

How Eleven Western runs it

Design partners, not subordinates

Our design-build architects are partners chosen for the project type. They hold the design; we hold the risk. Owners get one throat to choke without the design being an afterthought.

The budget is a design input

Cost lives inside every design conversation from day one, so the design that gets documented is the design that gets built.

Prototype discipline

For rollout clients, design-build compounds: one set of details refined across sites, with each project inheriting everything the last one learned.

What to expect, in order

Program & budget

Owner criteria locked with a target budget

Design team formation

Architect and engineers matched to the building type

Concept → contract price

Design advances with live pricing; the price typically locks at design development

Overlapped delivery

Early packages start while documents finish

Turnover & warranty

One party accountable through closeout and beyond

Roles & responsibilities

PartyResponsibility
Owner One contract, one point of accountability; approves program, budget, and milestones
Architect / consultants Design team under the EWB umbrella, selected for the project type
EWB Total delivery accountability: design management, cost, schedule, construction, warranty
Subcontractors Bought against documents the builder helped shape; design-assist trades early where warranted

⚠ Owner loses independent design advocacy

Transparent design milestones with owner sign-off at each; owners are encouraged to engage their own criteria consultant on complex programs.

⚠ Scope ambiguity hiding inside a single number

The basis-of-design document is written in owner-readable scope language and walked through line by line before contract.